Start with a requirements sheet and compare candidates against it. Keep technical evidence, included equipment and site work visible throughout the buying process.
- Which candidates meet your required product and format range?
- What evidence and remaining site work should be attached to each comparison?
Build a project-ready equipment shortlist
Define the packaging project first, then collect candidates with their references and requirement matches. Keep the original source record attached to each entry. A useful shortlist exposes differences and unresolved questions instead of simply collecting attractive machine photographs.
Define the application
Record product, container material and size, closure, nominal speed, format range, utilities and available floor space.
Compare like with like
Separate the machine itself from optional conveyors, change parts, controls, manuals, guarding, inspection systems and spare parts.
Build the delivered cost
Include inspection, dismantling, packing, loading, transport, duties, installation, modifications, validation and production start-up.